By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: What is Amount of Gross Electricity Production in Bosnia-Herzegovina?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > What is Amount of Gross Electricity Production in Bosnia-Herzegovina?
BUSINESS

What is Amount of Gross Electricity Production in Bosnia-Herzegovina?

Published December 17, 2019
Share
SHARE

 

 

The Directors of the Electric Power Industry of Republika Srpska, Luka Petrovic and the Electric Power Company of HZHB, Marinko Gilja, signed in Mostar contracts for joint production of electricity at the Capljina Hydroelectric Power Plant in 2020, with an estimated value of 100 million BAM.

The provisions of this contract of the Republika Srpska Electric Power Company are obliged to provide regulated discharge of water at the Gorica Dam of its Trebinje Hydro Power Plant, while Mostar Electric Power Company has undertaken to provide electricity production at the Capljina plant.

Petrovic said that this contract continues the good cooperation between the two power companies and that the signed contract is of benefit to both companies, but also the local communities Neum, Capljina and Ravno.

Gross electricity production in Bosnia and Herzegovina in 2018 was 19.160 GWh, out of which 6.519 GWh or 34% was produced in hydropower plants and 12.079 GWh or 63% in thermal power plants, and 562 GWh (3%) was produced in auto producers and others (wind and solar power plants).

Own consumption in power plants was 1248 GWh, and 364 GWh in other energy sectors.

In final electricity consumption in 2018 households participated with share of 40.9%, industry with share of 37.6% and other consumers including construction, transport and agriculture with 21.5%.

The largest share in final electricity consumption in 2018 at industry sector had a Non-Ferrous Metals Industry with 41.5% while Iron and Steel Industry participated with share of 19%, according to BiH’s Agency for Statistics.

Total heat production in Bosnia and Herzegovina in 2018 was 5.759 TJ, out of which 3.412 TJ or 59.2% was produced in district heating plants, 1.757 TJ or 30.5% in thermal power plants and 590 TJ or 10.3% was produced by auto producers.

In final heat energy consumption in 2018, households had the largest share of 74.6%, and industry and other consumers with a share of 25.4%.

 

Interesting Story about “Mysterious Man” in Sarajevo revealed

Minister Podzic visits BH Cadets at Air Force Academy of the Republic of Turkey

EUFOR Exercise Quick Response 20 to be held in spite of COVID-19

930 Million Euros Worth Contract Signed with the Company “Buroj Property Development”

Research shows how Religious are Citizens of Bosnia-Herzegovina

TAGGED:#BiH#electricity#money#statistics
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Police of Bosnia-Herzegovina and Serbia in Action of Breaking up the Illegal Smuggling of Migrants
Next Article Research shows how Religious are Citizens of Bosnia-Herzegovina
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Collegium Artisticum Opens 47th Exhibition: Grand Prix Awards Highlight Contemporary Art Scene in Sarajevo
April 4, 2026
Trump threatens: “Iran has 48 Hours or Hell will reign”
April 4, 2026
Zeljeznicar and Sarajevo will play the 158th Eternal Derby
April 4, 2026
A 3.33 Meter high Easter Egg in Kraljeva Sutjeska
April 4, 2026
Cvijanovic: Republika Srpska and its Police were created to last forever
April 4, 2026
“The Issue of State Property can only be resolved by Passing a law in PSBiH”
April 4, 2026
With EU support an additional 10 Million sqm of land in BiH is Mine free
April 4, 2026
Domazet: We should not lose Hope that Economic Growth is possible even in Conditions of Inflation
April 4, 2026
Sarajevo Canton Government Approves New Police Vehicles Procurement For Interior Ministry
April 4, 2026
The Exhibition “Sarajevo Time Capsule” on April 6th
April 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?