By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Take a Look of a modernized City of Zenica
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Take a Look of a modernized City of Zenica
OTHER NEWS

Take a Look of a modernized City of Zenica

Published May 11, 2015
Share
SHARE

zenica kruzni tok The construction of the Major Urban Highway (GGM) in Zenica has given a new dimension and the modernization of transport infrastructure to ‘’the city of steel’’.

As part of the Project for construction of Major Urban Highway, 14 roundabouts were built, which made traffic lights out of use. Although the roundabouts represented a problem at first, the drivers already got used to their use. Roundabouts and converting a part of the main road M-17, which runs through the city, will enable circular traffic in the city which will reduce traffic jams and improve traffic flow.

kruzni tokDirector of the Executive Agency for the construction of GGM, Mirsad Heleg, said that the construction of roundabouts improved all aspects of traffic in Zenica.

“We started project with the first five roundabouts, and after analysis we found out that roundabouts provide a better flow of traffic and present a special decoration in the city. Certainly there are other aspects that have been improved by building roundabouts within and outside the city’s main highway” said Heleg.

He added that using roundabouts, the safety of pedestrians as well as drivers was raised to a higher level.

“Although roundabouts have more conflict points, the practice so far showed decreased number of traffic accidents, and if they occur, the result is mostly minor damage. Roundabouts are safer for pedestrians because the speed of entering the roundabout is limited to 30 kilometers per hour, “added Heleg.

In the previous period, roundabouts were decorated with seasonal flowers, shrubs and bushes that decorated the city and have a longer duration as well.

crkvice zenicaSo far, 3,250 meters of the city’s main road is built in Zenica. The third phase of the project of building GGM from roundabouts at Express restaurant to the newly designed roundabout at the intersection Blatuša-Stacionar will be finalized soon. In the coming period, the construction of the outer section of the GGM with overall length of 4,480 meters is expected to begin.

 

(Source: klix.ba)

Bosnian Soldier returned from Afghanistan and surprised his Daughter (video)

Employees of Zoi’84 Enterprise Continue to Strike

Sattler and Platzer offer their congratulations for BiH Armed Forces Day

6,250 White Pine Seedlings planted near Sarajevo

Four Strong Earthquakes hit Region around Tuzla

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Bicycle Race “Sarajevo Grand Prix 2015” to break the Guinness World Record?
Next Article Vispak“ exports its Espresso to the Market of Egypt
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The BiH Presidency adopts the Annual Report of the Central Bank of BiH
April 29, 2026
Call Centres dismantled and Ten arrested in EUR 50 Million Online Fraud Case
April 29, 2026
TI BiH: Bosnia and Herzegovina risks losing 373 Million Euros
April 29, 2026
2.8 Million BAM in Incentives for Agricultural Production paid out in RS
April 29, 2026
Public Hearing of BHANSA Management on May 18th
April 29, 2026
Prohibiting Measures imposed to Defendants in the “Envelope” Case
April 29, 2026
EU Donates Equipment to Support BiH Border Police in Fight Against Migrant Smuggling and Trafficking in Human Beings
April 29, 2026
EU and NATO Chiefs in Sarajevo: Western Balkans Stability a Shared Priority, Partnership with BiH Key for Future
April 29, 2026
Dubrovnik Summit: US remains Europe’s main Strategic Partner
April 29, 2026
The 9th Meeting of the Special Group on Public Administration Reform held in Sarajevo
April 29, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?