By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Chinese Companies to build 100 Million Euros-worth Section in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Chinese Companies to build 100 Million Euros-worth Section in BiH
BUSINESS

Chinese Companies to build 100 Million Euros-worth Section in BiH

Published: June 8, 2019
Share
SHARE

The administration of the Federation BiH Motorways has decided that two Chinese companies will build the most costly motorway section on the Corridor 5-C, Počitelj – Zvirovići, whose total value is 200 million KM (100 million euros), daily newspaper ‘Dnevni Avaz’ learns today.

It is an 11 kilometers-long motorway section, which includes the construction of the Počitelj bridge, the total length of 945 meters and a maximum height of 100 meters.

The China State Construction Engineering Company and ‘Synohydro Power China’ submitted the most favorable bids for the construction of this section, which was accepted by the FBiH Motorways after the evaluation procedure.

This section of the motorway is financed through the loan agreement with the European Investment Bank (EIB), which, according to “Dnevni Avaz”, has finally given green light for awarding of the contract and the start of construction.

The China State Construction Engineering Company has pledged to complete the road section on both sides of the bridge and the Počitelj loop, for 66.2 million euros, while the bridge itself will be built by ‘Synohydro Power China’ for the amount of 32.8 million euros, Federal News Agency reports.

OSCE HC Lamberto Zannier comments on Award to be given to brave Bosnian Students
Via Dinarica hiking Trail named one of National Geographic Traveler’s Best Trips
Tourist Choice: In the nice, old town of Visegrad
Analysis: Airports Sarajevo and Tuzla recording a Major Increase
World Bank projects BiH’s economy to expand by 3.2 Percent in 2018
TAGGED:#BiH#bridge#chinese#construction#pocitelj
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article What are Challenges and Opportunities ahead of BiH within EU Accession Process?
Next Article Remains of Twelve Bosniak Victims found on Mt.Igman
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Conference on modern Security Challenges held in the Parliamentary Assembly of BiH
June 25, 2026
Interview with Commander of NATO HQ Sarajevo Brigadier General James Fowler: Stronger Defense Reforms Key to BiH’s NATO Path
June 25, 2026
EU and Council of Europe launch Project to strengthen the Institutional Capacity of the Constitutional Court of BiH
June 25, 2026
Sarajevo Airport has completely adapted its Infrastructure to People with reduced Mobility
June 25, 2026
A Strong Message from Germany: “Dodik and Trump Administration Pose the Main Threat to BiH”
June 25, 2026
Balkan Gets a New “Country”
June 25, 2026
The New Great Game in the Balkans
June 25, 2026
Key Financial Institutions Send a Joint Message: Retail Deposits Are Safe, BiH Financial Sector Remains Stable
June 25, 2026
BiH among the Top Polluters, Thermal Power Plants for Years Breach the Emission Limits
June 25, 2026
Deputy Minister of FA participates in the ASPEN Working Group for the WB
June 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?