Construction of a children playground that will be located in front of the House of Culture Logavina is slowly nearing completion. Contractors, workers of the company BOSMAN, are preparing the terrain to place the foundation and install the fittings.
The playground will consist of two parts.
The first part will have rubber foundation (rubber cubes), while the second part will be covered with gravel. Children fittings will be installed on the playground. The first part will have a slide and two swings, and the other part will have a metal teeter and two more swings. The playground will also have two wooden benches and two trash bins.
This playground is a gift from the brotherly Municipaity of Karpoš, Macedonia. They will cover all costs of construction with 15.000 EUR.
(Source: klix.ba)